| Issued Date | Folder No | Type | Status | Subject | Purpose |
|---|---|---|---|---|---|
| 20261016 | EP085821 | EP-COMMERCIAL | ACTIVE | complete electrical for elevator modernization project including: Installing microswitch for battery lowing, new LED lighting in pit and machine room, GFCI outlets in pit and machine room, piping phone line into new controller, install new #6 copper bond wire to main system ground from elevator controller and provide power to new elevator controller. (this is the second elevator to be upgraded in the building) | |
| 20251208 | EP083260 | EP-RESIDENTIAL | ACTIVE | Remove fuse panel and replace with breaker panel, replace light fixtures, Install GFCI receptacle, disconnect range and relcate |