| 20260901 |
PP060699 |
PP-PLUMBING |
ACTIVE |
515 FOUL BAY RD VICTORIA BC V8S 4G9 |
New Fixture 2 Bathtub; New Fixture 2 Domestic Hot Water Tank; New Fixture 2 Shower; New Fixture 7 Sink - Basin/Lavatory; New Fixture 7 Sink - Residential Kitchen; New Fixture 7 W.C. - Toilet; |
| 20260604 |
BP060177 |
BP-BLASTING |
ACTIVE |
BLASTING |
BLASTING COMMENCING JUNE 11, 2026, ENDING JULY 10, 2026 |
| 20251117 |
BP059077 |
BP-COMPLEX |
ACTIVE |
4 UNIT TOWNHOUSE |
PARTIAL PERMIT ISSUED JUNE 17, 2025: EXCAVATION AND FOUNDATION TO GRADE
FULL PERMIT ISSUED [DATE]: CONSTRUCT NEW 4 UNIT TOWN HOUSE
BLOCK 2 BUILDINGS/4 DWELLING UNITS
2024 BCBC |
| 20251114 |
BP059079 |
BP-COMPLEX |
ACTIVE |
5 UNIT TOWNHOUSE |
PARTIAL PERMIT ISSUED APR 9, 2025: EXCAVATION AND FOUNDATION TO GRADE
FULL PERMIT ISSUED NOV 14, 2025: CONSTRUCT NEW 5 UNIT TOWNHOUSE.
BLOCK 4 BUILDINGS/5 DWELLING UNITS.
2024 BCBC |
| 20251113 |
BP059078 |
BP-COMPLEX |
ACTIVE |
4 UNIT TOWNHOUSE |
PARTIAL PERMIT ISSUED JUNE 17, 2025: EXCAVATION AND FOUNDATION TO GRADE
FULL PERMIT: CONSTRUCT NEW 4 UNIT TOWN HOUSE
BLOCK 3 BUILDINGS/4 DWELLING UNITS
2024 BCBC |
| 20250930 |
EP082667 |
EP-RESIDENTIAL |
ACTIVE |
|
wiring for two new units that are being created, partial rewire in another unit, adding baseboard heat in all units and upgrading the service and panel to each suite.
installation of new underground service. |
| 20250918 |
PP060106 |
PP-PLUMBING |
ACTIVE |
7 SUITE APARTMENT |
New Fixture 1 Storm/Foundation/Site Drainage; |
| 20250912 |
PP060091 |
PP-PLUMBING |
ACTIVE |
515 FOUL BAY RD VICTORIA BC V8S 4G9 |
New Fixture 13 Bathtub; New Fixture 15 Clothes Washer; New Fixture 15 Dishwasher; New Fixture 15 Domestic Hot Water Tank; New Fixture 15 Hose Bibb; New Fixture 11 Shower; New Fixture 49 Sink - Basin/Lavatory; New Fixture 15 Sink - Residential Kitchen; New Fixture 32 W.C. - Toilet; |
| 20250505 |
BP059309 |
BP-COMPLEX |
ACTIVE |
7 SUITE APARTMENT |
CHANGE OF USE FROM 5 SUITE APARTMENT TO 7 SUITE APARTMENT. NEW UNIT 202 ON MAIN FLOOR.
BCBC 2024 |